Home. Archive Map. Archive A-G. Archive H-Z.

2008 Felixstowe’s Fate

Home | Search and Site Map

Beach Recharge Manor End Felixstowe
Pipe bringing beach recharge materials
Caterpillar Bulldozer levelling off material with pumping station in the background
Jcb’s moving rocks for beach recharge material near the Manor End  Felixstowe
3 June 2008 steady progress is being made with the South Seafront Beach recharge at Felixstowe  with materials being bulldozed to level the beach so that rocks can be put in place to construct the  groynes needed to retain the the sand and shingle.  Hopefully this will work !