Home. Archive Map. Archive A-G. Archive H-Z.

2008 Felixstowe’s Fate

Home | Search and Site Map

It’s a Gusher

With the south seafront land blocked off for safety  reasons materials from the dredger 'Sand Harrier' are seen here being  pumped ashore via the pumping station 'Sliedricht 27' using the 2-kilometre steel pipe.

The output from the pipe has to be kept free and it is exciting to watch the bulldozer driver quickly pushing  the material to one side so that pumping can continue according to the tide

No Access to the South Seafront Beach

It’s a gusher  with bulldozer pushing  the material to one side

A lagoon soon builds up with the force of the material

Material ready to be levelled off with dredger in the background

It’s A gusher ! Beach Recharge Felixstowe